Fenland Landscape Against Turbines

 

Transportation and Construction


Wind Turbines being transported in Wales
Photo courtesy of Cefn Croes Campaign

NOTE: The proposed wind turbines for Marshland St James are 130 metres.

Table 1. Wind Turbine Transport Characteristics

RI Highway Parameter

RI Highway Threshold

Vestas V80 (max)

GE 1.5

Load

80 tons 160,000 lbs. (with permit)

163,345 lb

197,000 lb

Height

16 feet

14’ 3”

15’ 8”

Slope

4.8%

8%

10%


 

Tokra Web Design, Hosting & Maintenance